|
Software
> Preventive Maintenance > Performing PM
Once PM’s are set up we can perform Pm’s two ways:
| Inspection List |
|
| The inspection list is a detailed description of the route. Ach
inspection is scheduled within the route, TeReMa can therefore handle
many inspection intervals within a route and they will only print
out when they are due (Automatic Scheduling). |
 Click
to enlarge |
Hand Held Unit
The hand held unit save your organization a step in the
documentation process. All problems found, measuring points, and work
order generation
is done from the hand held. The handheld is docked after route is complete
and history, compliance to schedule, measuring points, and work requests
are downloaded into the system.

If no problem is found with the equipment, just click checkbox, next
inspection appears.
Hand held screen contains same information as inspection list plus some
more features.

Example of Measurement screen. Last reading date and time is displayed
together with current record. If “list” is clicked, a measurement
history pops up.
|